Post-Construction Clean
When a build finishes, the GC needs the building empty, gleaming, and audit-ready in 7–10 days. We staff post-construction crews against the GC's punch list, document every floor / fixture / glass surface with paired before/after photos, and walk the owner through with a single tablet of evidence — not a binder.
Scope of work
Sweeping, vacuuming, gross dust knockdown.
Fixture polish, hardware detail, paint speck removal.
Tablet evidence + sign-off at handover.
Day-of-occupancy second pass if needed.
Where this program shows up
Scoped against the GC's schedule. Crews staffed in 24 hours; turnover documented in CleanTrack.
Nightly or daily routine — dust, vacuum, wash, restock — verified with timestamped photo proof.
DEEPQuarterly or seasonal heavy-clean — carpets, glass, vents, kitchens — with before/after evidence.
MEDIClinic, lab, and ambulatory care cleaning under documented terminal-clean + biohazard protocols.
Run post-construction clean with proof attached
Set up the program in 10 minutes. Your first verified report goes out tomorrow.
Create your workspace