Services · 04 · BUILD

Post-Construction Clean

When a build finishes, the GC needs the building empty, gleaming, and audit-ready in 7–10 days. We staff post-construction crews against the GC's punch list, document every floor / fixture / glass surface with paired before/after photos, and walk the owner through with a single tablet of evidence — not a binder.

Start freeAll services
24h
CREW STAGED
from GC notice
≤7d
TURNOVER
rough → owner sign-off
Tablet
HANDOVER
not a 200-page binder
What's included

Scope of work

01
Rough clean (debris + dust)

Sweeping, vacuuming, gross dust knockdown.

02
Final clean

Fixture polish, hardware detail, paint speck removal.

03
Owner walkthrough

Tablet evidence + sign-off at handover.

04
Construction touchup

Day-of-occupancy second pass if needed.

Typical deployments

Where this program shows up

01Office tenant improvement (TI)
02Retail build-out turnover
03Multi-family residential delivery
04Hospital / clinic addition handover
Crew standards
Certifications on file
WHMIS 2015
For solvent + adhesive remover handling.
Fall protection
Where high ladders are required.
Engagement
Per-project fixed bid

Scoped against the GC's schedule. Crews staffed in 24 hours; turnover documented in CleanTrack.

Run post-construction clean with proof attached

Set up the program in 10 minutes. Your first verified report goes out tomorrow.

Create your workspace
Post-Construction Clean — CleanTrack services